The Deloitte building needed an extremely high level of accuracy.
Site
20 Customhouse Quay, Wellington
Installed
May 1, 2018
Services
Grinding and floor preparation
Floor levelling
―
This job required high specification concrete grinding. The total floor area had to be ground to within a 1mm variance, to allow for 1200mm long tiles. Grindstone achieved this specification and made sure the job done was done efficiently, without fuss and all while ensuring that the quality of the work was never compromised.